Refresh
New cabinets in the existing runs, new tops, backsplash, paint and lighting. The sink, dishwasher and range reconnect where their lines already end.
Sandstone Construction & Remodeling handles kitchen remodels across New Braunfels and nearby Comal County towns. Some keep every pipe in place and replace cabinets, tops and lights; others move the sink, remove a wall or add an island. That choice decides the trades involved, whether the city requires a permit and how long you cook elsewhere.
Office hours 8 AM–11 PM daily
Worn finishes point toward a refresh. Too little counter, a cramped work path or a wall that isolates the cook point toward moving things.
New cabinets in the existing runs, new tops, backsplash, paint and lighting. The sink, dishwasher and range reconnect where their lines already end.
Most of the room stays, but a peninsula becomes an island, a pass-through opens, or the cooktop shifts to a wall where its hood can vent outside.
Walls come down or the sink and range trade places. On a slab, a relocated drain means a trench through the concrete, inspected before it is patched.
Cabinets drive the schedule. Stock, semi-custom and built-to-measure lines carry very different lead times, so selections are locked in before demolition rather than while the room sits gutted. Finalize the appliance list first; a wider range or a counter-depth refrigerator changes the openings the cabinet plan has to leave.
Counters in stone or quartz are usually templated from the installed base cabinets, then fabricated, so expect a stretch with no working top. Pick the sink and cooktop before templating, because the cutouts come from those exact models.
An island needs a job before a size. Seating and storage alone is cabinetry and a top; a prep sink brings water and a drain to mid-floor, and a cooktop brings its own circuit or gas line plus an exhaust plan.
Flooring laid beneath the cabinets lets you rearrange them years from now without hunting for matching planks; flooring cut around the toe kicks saves material today. Decide early, along with how the new floor meets the rooms beside it.
Light and power are easiest to add while walls are open, so they belong in the first estimate, not in change orders after the drywall is patched.
New Braunfels lists the 2020 National Electrical Code among its adopted codes. Wiring and plumbing changes are priced into the estimate, and that work goes to trade contractors who hold the state licenses Texas requires.
Ventilation also gets settled early. A hood ducted outdoors removes heat, grease and steam that a recirculating unit only filters, and the duct route through a wall or roof is easier to plan before cabinets are ordered. The city’s adopted 2021 International Residential Code governs where kitchen exhaust discharges and when a high-capacity hood needs makeup air. In a Hill Country summer an oversized hood also pulls cooled air out of the house, so size it to your cooking.
Moving out for a kitchen remodel is rarely necessary. A stand-in kitchen in a utility room or garage, with the old refrigerator and a couple of countertop appliances, covers most meals. Doorway barriers and covered return-air grilles keep dust contained. Water or power goes off for certain tasks and demolition is loud, so plan pets and kids around those days.
Time without a kitchen depends on factors, not a fixed figure: whether anything moves, inspections, cabinet lead times and countertop fabrication. Making every selection before demolition is what you control most.
Within New Braunfels city limits, a building permit is needed once a kitchen job alters the structure or the electrical, gas, mechanical or plumbing systems. The city’s permits page lists the exceptions that matter here: new cabinets, new floor covering, paint, and faucet or light fixture swaps that leave pipes and wiring as they are.
A permitted kitchen remodel goes in with what the city’s remodel checklist calls for: a detailed scope noting the square footage being remodeled, before-and-after floor plans, beam and header details for any wall opened or removed (a bearing wall may need an engineer’s drawings), and mechanical, electrical and plumbing drawings where that work applies. The city requires registration from each contractor, not just the general contractor, and the trades apply for their own permits ahead of construction. Properties in a mapped floodplain, common along the Comal and Guadalupe, add the city’s floodplain application.
For permitted work, the application is submitted before demolition and the permit is issued to the contractor of record. Outside city limits, including most of the Canyon Lake and Spring Branch area, Comal County’s rules apply; Garden Ridge and Bulverde are separate cities with their own review. We checked the city’s permits page and checklist in October 2026; confirm your scope with the issuing office and see the New Braunfels remodel permits guide.
A kitchen in a long-term rental, or a vacation home near Gruene or Canyon Lake, takes harder use than an owner’s kitchen, and every day it is torn apart is a day it earns nothing. Priorities shift toward tops that survive spills and scrubbing, appliances guests can run without instructions, floors that handle wet feet after a day on the river, and outlets where visitors plug in. Many owners book this work for the cooler months and keep the layout so the unit returns to service sooner. See short-term rental remodels for planning around bookings.
Sandstone Construction & Remodeling · 306 River Bend Dr, New Braunfels, TX 78130. Call (830) 400-4369 · Office hours 8 AM–11 PM daily.
The city’s permits page lists replacing cabinets and floor covering as cosmetic work that does not need a building permit. Moving a wall or changing electrical, gas, mechanical or plumbing systems does need one. Confirm your exact scope with the city before work begins.
Yes. Range width, refrigerator depth, a built-in microwave and the hood all set cabinet openings, and the sink and cooktop models set the countertop cutouts. Choosing them first avoids reordering boxes or recutting a top.
Most families do. A spare room or the garage becomes the temporary kitchen, doorways get dust barriers, and water or power is off for short stretches on certain days.
Durable, easy-to-clean surfaces, simple appliances with available parts, flooring that tolerates wet feet, and work scheduled in the slow season. Keeping the layout usually returns the kitchen to service sooner.